Lifting equipment register with thorough examinations and weekly checks
Each of your cranes, hoists, forklifts, slings and shackles has its own examination interval, and a hired-in item may run out of date while it is on site. The register keeps every item and accessory, logs each report of thorough examination and shows what is due, overdue or quarantined.
- 300 items and 1,500 examination reports
- Intervals from Schedule 1 – 6 or 12 months
- Defects, quarantine and re-examination
- Hire and loan records with expiry warnings

Intervals by type of equipment
SETTINGS holds 24 equipment types with their examination periods from Schedule 1 of the 2007 General Application Regulations – for example six months for lifting accessories and for equipment used to lift people. You can edit them if your competent person sets a shorter interval.
What the tabs look like




Reports, defects and quarantine
- Log each report of thorough examination or test in EXAMINATIONS
- Defects found go to DEFECTS & QUARANTINE with a fix-by date
- The item stays quarantined until it is repaired and re-examined
- EQUIPMENT REPORT prints a one-page record of any item
Hired-in kit and weekly checks
HIRE & LOANS records items hired in, lent out or hired out and warns when the certificate will run out during the hire. WEEKLY CHECKS has room for 3,000 weekly or pre-use inspections, and the 12-MONTH CALENDAR shows every item month by month with the expected cost.
Technical details
- START
- SETTINGS
- EQUIPMENT
- EXAMINATIONS
- DEFECTS & QUARANTINE
- HIRE & LOANS
- WEEKLY CHECKS
- 12-MONTH CALENDAR
- EQUIPMENT REPORT
- DASHBOARD
- File format
- .xlsx
- Tabs
- 10
- Capacity
- 300 items · 1,500 exam reports · 300 defects · 200 hire records · 3,000 weekly checks
- Requires
- Excel 2016+ / Microsoft 365
- Macros
- None