PSCS site safety records – inductions, sign-in, permits and inspections
The Project Supervisor Construction Stage has to show that the site is coordinated: who was inducted, who was on site each day, which permits were live and what the weekly inspection found. The workbook keeps those registers together and flags anyone on site without an induction or with an expired card.
- 300 people inducted with card expiry
- 3,000 daily sign-in lines
- 200 permits to work checked to the minute
- Weekly inspection with 58 checks in 13 areas

Registers kept in one place
| Tab | What it holds |
|---|---|
| INDUCTIONS | Company, role, Safe Pass and CSCS expiry |
| SIGN-IN | Daily in and out, flagged if not inducted |
| PERMITS | Hot work, confined space entry, digging, working at height, isolations and lifting operations |
| TOOLBOX TALKS | Date, topic, presenter and attendance |
| RAMS | Risk assessments and method statements per subcontractor |
Client, PSDP and PSCS on record
SETTINGS records the duty holders and keeps the client's notification (AF1) and the PSCS notification (AF2) apart, with a warning if they do not match. It also lists the conditions for appointing the PSCS, so the appointment can be checked.
Questions and answers
When is a PSCS needed?
Does it check Safe Pass and CSCS cards?
What happens to findings from inspections?
Screenshots from the file




Workbook facts
- START
- SETTINGS
- INDUCTIONS
- SIGN-IN
- PERMITS
- INSPECTIONS
- TOOLBOX TALKS
- RAMS
- INCIDENTS & ACTIONS
- DASHBOARD
- File format
- .xlsx
- Tabs
- 10
- Capacity
- 300 people · 3,000 sign-ins · 200 permits · 150 RAMS · 300 actions
- Requires
- Excel 2016+ / Microsoft 365
- Macros
- None
What it is not
This is the set of site registers, not the construction stage Safety and Health Plan itself and not the Safety File the PSDP hands over at the end. The HSA's BeSMART service offers a plan template; the workbook holds the day-to-day evidence behind it.